DocMakDocMak
← Back to all tools

Fix the boundaries

Scope of Work Maker

Write a scope of work that states included work, exclusions, deliverables and acceptance criteria.

Your company

Company logo

PNG, JPG, SVG or WebP. Max 2MB.

Document details

Supplier / contractor

Client

Deliverables and acceptance criteria

Line 1
Line 2
Line 3
Line 4

Scope sections

1.
2.
3.
4.
5.

Scope notes

No signup required for your first 100 documents. Create an account to save history.

Template wording only, not legal advice. Have your contract and scope reviewed before signing.

Your Company FZE
Business Bay, Dubai, UAE
Licence SPC-92381 · TRN 100123456700003
SCOPE OF WORK
SOW no.: SOW/2026/0001
Date: 17 Sept 2026
Project nameOffice fit-out, Level 12
Related contract / POPO-2026-0417
Commencement
Completion
Supplier / contractor
Your Company FZE
Business Bay, Dubai, UAE
Client
Gulf Logistics LLC
Jebel Ali Free Zone, Dubai, UAE
Deliverables and acceptance criteria
DeliverableAcceptance criterionDue
Measured survey and layout drawingDrawing signed by client representativeWeek 2
MEP first fixInspection passed and photographedWeek 5
Joinery installationSnag list closed within 5 working daysWeek 8
Handover pack (as-builts, warranties)Pack received and acknowledged in writingWeek 9
1. Included services

Supply, installation, testing and commissioning of partitions, joinery, MEP first and second fix, flooring and decoration to Level 12 as shown on the approved layout, including protection of common areas and removal of debris.

2. Exclusions

Authority permits and NOCs, structural works, IT cabling beyond the floor distribution board, loose furniture supply, out-of-hours works not requested in writing, and any works to adjoining floors.

3. Client responsibilities

Provide site access from 07:00 to 18:00, an approved layout free of further changes, building management approvals, power and water for construction, and a single nominated representative empowered to sign acceptance.

4. Standards and quality

All works comply with the approved drawings, applicable Dubai Municipality requirements and manufacturer installation instructions. Materials are new and to the approved sample where samples were submitted.

5. Change control

Any addition, omission or substitution is submitted in writing with price and time impact and is only executed after written client approval. Verbal instructions are not actioned.

Scope notes

This scope of work forms an annexe to the related contract or purchase order. Where the contract and this scope conflict, the contract prevails unless the parties agree otherwise in writing.

Accepted for the client
Name, signature & date
Accepted for the supplier
Name, signature & date
ops@yourcompany.ae · +971 50 000 0000

Project delivery workflow — step 3 of 6

  1. Project Proposal
  2. Project Plan
  3. Scope of Work
  4. Timesheet
  5. Progress Report
  6. Completion Certificate

Documents that usually come next

Continue the same workflow without re-typing your company details.

How to write a scope of work

Scope of work: what is in, what is out, how it is accepted

A scope of work is the part of a contract that gets read when something goes wrong. Its value comes from precision: named deliverables, measurable acceptance criteria, explicit exclusions and a written change-control route. This maker gives you those sections as editable text with a deliverables table beside them, and prints a clean A4 document you can attach to an agreement.

Contractors, fit-out firms, facilities providers, IT integrators and consultancies in the UAE and GCC use it as the annexe that turns a priced proposal into an enforceable brief.

  • Deliverables table with acceptance criteria and due dates
  • Separate included-services and exclusions sections
  • Client and supplier responsibility split
  • Change-control wording so variations are priced before work starts
  • Signature blocks and branded PDF export for contract annexes

How to write a scope of work

  1. 1

    Describe the work in plain terms

    Say what will be done, where and to what standard, in language a non-technical approver can check.

  2. 2

    List deliverables and acceptance criteria

    For each deliverable, state what proves it is complete — a test result, a signed report, a demonstration.

  3. 3

    Write the exclusions

    Exclusions prevent more disputes than inclusions. Name the work, materials and approvals that are not yours.

  4. 4

    Add responsibilities and change control

    Split duties between you and the client, then state how a change is requested, priced and approved.

Frequently asked questions

What is a scope of work?+

A scope of work is the document that defines exactly what a supplier will deliver: the services included, the deliverables, the standards applied, the acceptance criteria, what is excluded and how changes are handled. It is normally an annexe to a service agreement or contract.

Is a scope of work the same as a statement of work?+

In practice the terms are used interchangeably, and both are abbreviated SOW. Statement of work is more common in IT and government contracting; scope of work is more common in construction, fit-out and facilities work across the Gulf.

Why do exclusions matter so much?+

Because most cost disputes are about work nobody priced. Writing down that permits, civil works, hardware supply, out-of-hours labour or third-party licences are excluded gives you a clear basis for a variation instead of an argument.

How do acceptance criteria work?+

Each deliverable gets an objective test — a passed inspection, a signed report, a measured result. Once the criterion is met the deliverable is accepted and, if your payment terms are milestone-based, becomes invoiceable.

Scope of Work guide, templates and country rules

Everything that pairs with the scope of work generator — the step-by-step guide, the templates businesses use alongside it, and the GCC rules covering local scope of work requirements.

WhatsApp