Completion Certificate Maker

Certify practical completion, list any outstanding snags and hand a project over for final payment.

Your company

Company logo

PNG, JPG, SVG or WebP. Max 2MB.

Document details

Contractor / supplier

Client / employer

Outstanding items (snag list)

Line 1
Line 2
Line 3

Certificate sections

1.
2.
3.
4.

Payment and retention notes

No signup required for your first 100 documents. Create an account to save history.

This certificate is a project record, not legal advice. Follow the certification and payment procedure in your own contract.

Your Company FZE
Business Bay, Dubai, UAE
Licence SPC-92381 · TRN 100123456700003
CERTIFICATE OF COMPLETION
Certificate no.: COC/2026/0001
Date: 17 Sept 2026
Project / worksOffice fit-out, Level 12
Contract / PO no.PO-2026-0417
Completion date
Defects liability period12 months from completion
Contractor / supplier
Your Company FZE
Business Bay, Dubai, UAE
Client / employer
Gulf Logistics LLC
Jebel Ali Free Zone, Dubai, UAE
Outstanding items (snag list)
ItemOwnerClosure dateStatus
Touch-up paint, meeting room 12BContractorWithin 7 daysOpen
Replace scratched door handle, receptionContractorWithin 7 daysOpen
Issue final as-built drawingsContractorWithin 14 daysOpen
1. Works certified

Supply, installation, testing and commissioning of partitions, joinery, MEP first and second fix, flooring and decoration to Level 12, executed in accordance with the approved drawings and the agreed scope of work.

2. Certification

The parties confirm that the works described above reached practical completion on the completion date stated and were handed over to the client for beneficial use on that date, subject only to the outstanding items listed.

3. Defects liability and warranties

The contractor shall make good, at its own cost, any defect in workmanship or materials notified during the defects liability period stated above. Manufacturer warranties for supplied equipment are assigned to the client on issue of this certificate.

4. Handover documents provided

As-built drawings, testing and commissioning records, operation and maintenance manuals, manufacturer warranty certificates, and the closed snag register once the items above are signed off.

Payment and retention notes

Issue of this certificate entitles the contractor to submit the final invoice in accordance with the contract. Retention, where held, is released per the contract terms at completion and at the end of the defects liability period.

Certified by contractor
Name, signature & date
Accepted by client / consultant
Name, signature & date
ops@yourcompany.ae · +971 50 000 0000

Project delivery workflow — step 6 of 6

  1. Project Proposal
  2. Project Plan
  3. Scope of Work
  4. Timesheet
  5. Progress Report
  6. Completion Certificate

Documents that usually come next

Continue the same workflow without re-typing your company details.

How to issue a completion certificate

A completion certificate that closes the job cleanly

Handover is where good projects lose money — final invoices sit unpaid because nobody signed anything confirming the work was finished. A completion certificate fixes the date, describes the works certified, lists remaining snags with closure dates and records the defects liability period. Once both parties sign, your final invoice has a document behind it.

Contractors, fit-out firms, MEP subcontractors, IT integrators and consultancies across the UAE and GCC use this format for practical completion, partial completion and service handovers.

  • Works certified, contract reference and completion date in the header
  • Snag and outstanding-items table with owner and closure date
  • Defects liability and warranty sections you can edit per contract
  • Handover document checklist section for as-builts and warranties
  • Three-way signature area and branded PDF export for the final account

How to issue a completion certificate

  1. 1

    Identify the works and the contract

    Name the project, the contract or purchase order and the exact works being certified as complete.

  2. 2

    Set the completion date

    State the date works were practically complete — this usually starts the defects liability period and any final payment clock.

  3. 3

    List outstanding items

    Record snags with a date for closure. Certifying with a clear snag list is far safer than certifying silently.

  4. 4

    Sign and hand over

    Both parties sign, you attach the handover documents, and the certificate supports your final invoice.

Frequently asked questions

What is a completion certificate used for?+

A completion certificate records that contracted works were completed on a stated date. It is used to trigger handover, start the defects liability or warranty period, release retention, and support the final invoice or payment application.

What is practical completion?+

Practical completion means the works are finished to the point where the client can use them for their intended purpose, even if minor snags remain. Those snags are listed on the certificate and closed within an agreed period rather than delaying handover.

Who signs a completion certificate?+

Normally the contractor or supplier issues it and the client, consultant or engineer countersigns. On larger UAE projects a consultant or supervising engineer certifies completion on the client's behalf, which is why the certificate carries two or three signature blocks.

Does a completion certificate release retention?+

It depends on your contract. Many contracts release half the retention at practical completion and the balance at the end of the defects liability period. State the retention position on the certificate so both parties record the same understanding.